|
Wildwood Calvary Chapel
Gathering Place- Design/build
|
Bid Date: 1/31/12 @ 2:00 pm
|
|
Yucaipa, CA
|
|
| Bids to: |
|
|
Bayley Construction
23101 Lake Forest Dr., Suite 200
Lake Forest, CA 92630
Phone: 714.540.8863
Fax: 714.556.1485
Plans & Spec's: LeAnna Ortiz (leannao@bayley.net)
|
|
| Description: |
You are invited to bid the following Phase 1B consisting of Civil, Landscaping and Design-build M.E.P's packages.
The Civil package is already pre-designed by the Owner's Engineer and includes the following trades: Surveying, earthwork, site utilities, asphalt paving, striping, site concrete, & masonry.
The Landscape Package consists of the following: Design-build based on the concept design provided by Alhambra Group (sheets L-I).
The Pre-fab Metal Building Package will include a complete turnkey design build Metal Building with Structure frame, Exterior walls including an option for plaster, roof, Metal deck, Stairs, Railing and any other related trades that are typically done by the Metal Building contractor.
The Design-build M.E.P package includes the following: Provide turnkey design-build services based on the plans labeled "Contract Drawings" for a new 2-story prefabricated metal building; (1st floor) 170' long x 70' wide & (2nd floor) 170' long x 83 wide. Total building is approximately 26k s/f.
This is a privately funded project and prevailing wages do not apply. Budget is $4M. Please be sure to use Bayley's bid form when submitting your proposal. Forward all technical questions to Fred Alas. Questions regarding plans, contact LeAnna Ortiz.
|
|
|